Phase 1 – Feasibility
Study/Budgeting:
-
Walk through of facility to
document existing ventilation concepts.
-
Written report of
walkthrough findings of existing systems including pictures.
-
Written report of optional
ventilation enhancement concepts.
-
Budget pricing of equipment
associated with ventilation enhancement concepts.
-
Four bound copies of
feasibility study.
-
Meeting with facility
manager to review report and discuss advantages/disadvantages.
Cost: $500 per 10,000 SF
of facility.
Phase 2 – Design Development:
-
Design Criteria Scope Of Services Report for use to hire
engineer to design system.
-
Conceptual design sketches of ventilation system to use for
installation cost budgeting.
-
Order of magnitude equipment sizing based of industry standard
ventilation criteria.
-
Meeting with facility manager to review Design Development
document prior to publication.
-
Four bound copies of Design Development documentation.
Cost: $750 per 10,000 SF
of facility.
|
Phase 3 –
Contract Document Engineering:
-
Note – Independent Of Phases 1 and 2
-
Design by Professional Engineer.
-
Engineering calculations to size final equipment.
-
Engineering drawings and specification.
-
Four bound copies of Contract Document drawings and
specifications
-
Pre-Bid meeting with contractor(s)
-
Construction follow-up and monitoring/commissioning of
system startup.
Cost:
$115/Hour + Printing expenses of contract document drawings
& specification or Negotiated Lump Sum Fee
|
|